Vacancies
  • +41 (44) 211-72- 60
  • office@asstra.com
  • Supplier’s Portal
  • Breakbulk Europe 2025


    JOIN ASSTRA IPL TEAM
    AT BREAKBULK EUROPE 2025
    IN ROTTERDAM!

    LOCATION: HALL 3, BOOTH 2M21
    DATES: 13-15 MAY 2025
    VENUE: ROTTERDAM AHOY, NETHERLANDS

  • The HR Quality Award

    ASSTRA POLSKA Sp. z o.o.
    is awarded the HR Quality Award

    A Prestigious Recognition in HR Excellence

  • AsstrA Sustainability

    ASSTRA
    SUSTAINABILITY

    Sustainability is a key priority for our business, and environmental protection is a crucial pillar of our ESG strategy.
    Moving forward, we remain committed to enhancing our ESG performance and amplifying the positive impact of our logistics
    operations. Through ongoing innovation, we strive to contribute to a more sustainable and responsible future.

Guarantee of your success
*Аnalytical data based on the results of the company in 2025

ASSTRA NEWS

AsstrA at Transport Logistic 2025 in Munich
AsstrA-Associated Traffic AG is excited to announce its participation in Transport Logistic 2025, the world’s leading trade fair for logistics, mobility, IT, and supply chain management. The event will take place from June 2-5, 2025, at the Trade Fair Center in Munich, Germany, where AsstrA will welcome industry professionals at Hall A4, Stand 232.
 
AsstrA Project Logistics: Customized Solutions
Transporting two water-cooled condensers from China to Uzbekistan was a major logistical challenge. The 7.8-meter-wide shipment was destined for the construction of a combined cycle gas turbine plant in Talimarjan. However, standard solutions were not applicable, as the width of the border crossing at the Kazakhstan-Uzbekistan border was only 7.2 meters.
 
Transportation of Machinery and Equipment from Belgium to Ukraine
AsstrA organized the transportation of excavators and generators from Belgium to Ukraine. Excavators weighing up to 9 tons and generators weighing between 200 kg and 4 tons were delivered directly, ensuring the safety of the equipment and optimizing transportation time. For transportation, we used MEGA-type tilt trucks with a height of 3 meters and a load capacity of 20 tons. Special attention was paid to cargo fixation. If standard fasteners were insufficient, the team promptly arranged their purchase, ensuring full compliance with safety requirements.